1 / 5
| Features | Knee patches (with kneepad access) Side organ pockets Can be made with reflective tape |
|---|---|
| Function | Workwear, driving trousers, painter trousers, work pants, industry trousers, workshop pants, etc. |
| Model | Construction Work Pants |
| Shell Fabric Options |
Option 1: TC, 65% polyester, 35% cotton, Twill, 195GSM, 21x21/108x58 Option 2: TC, 80% polyester, 35% cotton, twill, 190GSM, 21x21/108x58 Option 3: TC, 65% polyester, 35% cotton, plain, 165GSM, 23x23/88x64 Option 4: 100% cotton, twill, 180GSM, 21x21/108x58 Option 5: 100% cotton, plain, 185GSM, 20x20/100x55 Option 6: 100% cotton, twill, 270GSM, 16x12/108x56 *Fabric colors can be customized according to client requirements. |
| Button Details | Seven concealed poppers on center front |
| Pockets Configuration |
6 pockets total: - 2 x side pockets - 2 x combat style thigh pockets with flaps and fastenings - 2 x patch pockets on back with flaps and fastenings - 2 x knee patches (with kneepad access) |
| Trims & Accessories |
- 5# nylon zipper on center front - Dye to match on pocket flap - 28L dye to match button on CF |
| Size Range | 26" - 56" |
| Packing Details | 1pcs work pants/polybag, 20pcs/carton Carton size: 26"-34" (31x44x34cm) | 36"-46" (31x44x36cm) | 48"-56" (31x44x38cm) Capacity: 20" container loads ~10,500pcs | 40" container loads ~22,800pcs | 40" HQ loads ~25,000pcs |
|---|---|
| Trade Terms | FOB, CIF |
| Loading Port | Shenzhen (or other negotiated ports) |
| Payment Terms | T/T (30% deposit, 70% against the copy of B/L), L/C, Western Union |
| MOQ | 300 PCS |
| Sample Lead Time | 5 - 15 days |
| Delivery Lead Time | 30 - 45 days after order confirmation |
| Supply Ability | 30,000 pcs / month |
| Our Advantages | Over 7 years of production experience with skilled workers and professional technical staff |