Manufacturer Outdoor Waterproof Utility Men Softshell Winter Jacket

Product Description

Product Showcase Banner
Product Description
Manufacturer Outdoor Waterproof Men Softshell Winter Jacket
Style Name Tactical jacket
Style No RFJ13623-C3
Color customized
Materials 96%polyester 4% spandex with TPU and fleece 3layes 340g/m2.
Technical Feature Waterproof, breathable, windproof
Size No size limited, All size available (European/American) XS-5XL
MOQ 500pcs per color
FOB Port China Port
Supply Capacity 100,000pcs per month
Packing Way 1pc folded into one polybag, 10pcs one carton or as required
Payment Term 30% deposit, 70%TT after B/L copy file
Sample Time 7-15 days
Delivery Time 50-80 days after receiving final order
Sample Charge double * unit Price
Advantage Own garment factory: 800 workers with 10 years experience in workwear and outdoor wear.
Detail View 1
Detail View 2
Detail View 3
Detail View 4
Detail View 5
Detail View 6
Product Categories
Product Categories Overview
Company Information
Company Facility Overview
Company Operation Overview
Certifications
Factory Certifications
Product Process
Manufacturing Production Process
Show Room
Product Showroom Part 1
Product Showroom Part 2
Frequently Asked Questions
What are the primary materials used in this winter jacket?
The jacket is made of a premium high-performance fabric blend consisting of 96% polyester and 4% spandex with a functional TPU membrane and a warm 3-layer fleece lining (340g/m²).
Is this jacket suitable for extreme weather conditions?
Yes, the tactical softshell jacket is engineered with key technical features including being waterproof, windproof, and highly breathable to ensure protection in challenging outdoor winter environments.
What sizes are available for customization?
There are no sizing limits. All European and American sizes are fully available, ranging from XS to 5XL.
What is the Minimum Order Quantity (MOQ) and production capacity?
The Minimum Order Quantity is 500 pieces per color, and our manufacturing facility maintains a steady supply capacity of up to 100,000 pieces per month.
What are the timelines for samples and mass production?
Sample production takes between 7 to 15 days. Final order delivery and dispatch require 50 to 80 days after the final details of your order are confirmed.
What advantages does your manufacturing bring to partners?
We utilize a highly specialized garment factory powered by 800 skilled workers, bringing over 10 years of professional expertise in manufacturing premium workwear and outdoor garments.

Related Products